Outage Watch
Planned work

Field, Meningie, Meningie East, Waltowa

Job 181871 · restored

Planned outage affecting 49 customers in Field, Meningie and 2 more areas, starting 1:00 pm on 22 September 2026. Power was restored after 1h 11m. Reason: Accessing electrical equipment (under 15 mins).

Affected area

What changed

Each entry is a point where SAPN changed something. Identical polls are not recorded, so a short list means a stable outage.